EV and LB washroom transformation

Major renovations are being undertaken on two high-traffic washrooms on the Sir-George-Williams Campus. The ground floor facilities in the EV and LB buildings are being transformed into modern, inclusive washrooms.

Overview

Facilities Management is committed to improving campus spaces to make them more accessible and inclusive for all. The new EV and LB facilities have been designed based on Concordia’s most modern facilities, including those in Hall 6 and in FB-SS1.

Work on the new EV and LB washrooms will take place simultaneously in order to deliver both as quickly as possible.

Goals

  • Create inclusive, safe and universally accessible washrooms
  • Undertake work in accordance with best practices
  • Minimize disruptions to the community while work is underway

Features of new, inclusive washrooms

  • Gender neutral, multi-stall spaces
  • Two accessible stalls, including one with an automatic door opener
  • Tall stalls for safety and privacy
  • Bright, open, welcoming space

 

Alternative washrooms during work period

Fine Arts side of EV

There are washrooms located on the second floor, to the right and down the hall from the elevators.

The accessible washroom is located at EV 2.608. Please note that an ID card is needed to access the individual washroom.

GCS side of EV

There are washrooms located on the second floor, to the left and down the hall from the elevators.

The accessible washroom is located at EV 2.408. Please note that an ID card is needed to access the individual washroom.

Second floor of the Webster Library

  • Take the stairs or use the elevator if you have accessibility needs.
  • Turn left when you enter the library, down the hall and left again.
  • LB 212 and LB 214 are gendered washrooms, each with an accessible stall. Please note that there are no automatic door openers.

Sixth floor of the LB Building

  • Take the elevator to the sixth floor, then turn left, and left again at the next corridor.
  • LB 626 and LB 624 are gendered washrooms, each with an accessible stall. Please note that there are no automatic door openers.
A pre-concept study drawing of the EV and LB washroom redesigns
A pre-concept study drawing of the EV and LB washroom redesigns (subject to change)

A pre-concept study drawing of the EV and LB washroom redesigns. (Subject to change.)

Timeline

  • November 2022 to March 2023: Demolition work
  • March to October 2023: Construction of new washrooms

Questions? Ideas? Comments?

Send an email to Facilities Management.