Hingston Hall café space renewal
The refurbished area provides a wider variety of food and beverage options.
Project overview
Concordia has removed the existing café in Hingston Hall, wing HB, and prepared the space to accommodate three vending machines and two microwaves. The project ensures continuous, reliable food and beverage options to the Loyola Campus community.
The work includes the demolition of the existing café, upgrades to interior finishes and the installation of new electrical and service connections to support smart vending equipment and dedicated microwave outlets.
Completion date
November 2025
Project goals
- This project creates a refreshed, functional space that provides 24/7 access to convenient food and beverage options for the Loyola Campus community.
- The upgraded area supports a suite of vending machines offering snacks and beverages.
- The project expands on-the-go choices for students, faculty and staff by introducing a wider range of products than those previously available in the café, ensuring reliable service throughout the day and evening.