LB/Hall Buildings: Elevator pit barricade installation - October 16, 2026 (08:00 - 16:00)

October 7, 2026
|
By Vanessa Petrillo


To the users and occupants of the LB and Hall building,


A planned interruption of the LB and HALL Elevators is SCHEDULED for Friday, 2026-10-16, between the hours of 08:00 and 16:00. The Installation of barricades in the elevator hoist way pits are required for new RBQ code compliance.


Building(s)
 

  • S- H / Henry F. Hall Building
  • S- LB / Webster Library Building


Order of execution
:

  • S-H ELEV 1 – Passenger ELEV with access to S1 (Access to theater and Metro level)
  • S-LB ELEV 2-3 – 2 Passenger ELEVs in S-LB Lobby
  • S-LB ELEV 5-6 – 2 Passenger ELEVs Library


General Information
 

  • This interruption will cause noise to be produced when the barricades are anchored in.
  • Elevator interruptions will last approximately 1-2 hours per bank.
  • During the Installation of S-H ELEV 1, there will be no elevator access to S1 and the metro level while the installation is underway.
  • During the Installation of S-LB ELEV 2-3 BANK, only passenger ELEV1 from lobby & Freight from loading dock ELEV8/FREIGHT, will access the upper floors while the installation is underway.
  • During the Installation of S-LB ELEV 5-6 BANK, there will only be stair access from floors 2-5 within the library, and ELEV8/FREIGHT, while the installation is underway.


We thank you for your understanding.