notice
REMINDER: PC, PB and RA Buildings: Interruption of main electrical panel - September 5, 2026
To the users and occupants of the PC, PB, and RA buildings,
A planned interruption of the regular power is SCHEDULED for Saturday, 2026-09-05, between the hours 06:00 and 16:00. The electrical power supply will be interrupted to allow the contractor to replace the electrical connection between the Dome electrical panel and the L-PC electrical panel. The work will require the complete closure of the affected buildings to allow the contractor to perform the work safely.
Buildings
● L- PC / Perform Center
● L- PB
● L- RA / Rec & Athletics Building
General Information
● The affected buildings will be closed to occupants during the planned interruption.
● The interruption will affect the electrical systems in the buildings.
● Equipment and systems connected to emergency power will remain operational.
● Other electrical equipment and systems not connected to emergency power will be unavailable during the interruption.
● Building access will resume after 4:00 p.m., once the work and required safety checks have been completed.
We thank you for your understanding.
Property Management