UPDATE: PS/RF/HU/AD/CC/FC/HA/HB/HC/PY Buildings: Interruption of emergency power - August 11,17, 2026

July 31, 2026
|
By Souha Abou El-Naaj


To the users and occupants of the PS/RF/HU/AD/CC/FC/HA/HB/HC/PY buildings,

A planned interruption of the emergency power is SCHEDULED for Tuesday, 2026-08-11, and Monday, 2026-08-17, according to the table provided below. Preventative maintenance is required to inspect the generator, including quinquennial maintenance.

Buildings

  •   L- PS / Physical Services Building    
  •  L-RF / Conference Center
  •  L-HU / Applied Science Hub
  •  L-AD / Administration Building
  •  L-CC / Central Building
  •  L-FC / Smith Building
  •  L-HA / Hingston wing A
  •  L-HB / Hingston wing B
  •  L-HC / Hingston wing C
  • L-PY / Psychology Building
     

General Information

  • During these interruptions, emergency lighting and any equipment connected to emergency outlets that are not supported by an Uninterruptible Power Supply (UPS) will be affected.
  • Normal electrical power will not be affected by this maintenance.
  • Generator maintenance will cause two 10-second emergency power interruptions.

We thank you for your understanding.

Property Management