EV Building: Construction activity - July 23, 2026 (06:00 - 15:00)

July 21, 2026
|
By Souha Abou El-Naaj


To the users and occupants of the EV building,

A planned construction activity is scheduled for Thursday, 2026-07-23, between the hours of 06:00 and 15:00.

As part of work coordinated with the City of MontrĂ©al on St-Catherine Street, core drilling will be carried out through a foundation wall of EV building to install conduits for a future electrical connection between buildings, within a duct bank installed by CSEM. This construction is required as part of project  24-032 FB (Upgrade Electrical Infrastructure).
 

Building

  • S-EV / Engineering, Computer Science and Visual Arts Integrated complex
     

General Information

  • Core drilling will be performed in the foundation wall.
  • The work will take place exclusively in room S2-355.
  • Interior protection measures will be implemented in the work area.
  • Cleaning will be completed following the work.
  • Noise is expected during drilling operations, primarily before 9:00 a.m.
  • Material will be transported via the loading dock and elevator for a short period.

 

We thank you for your understanding.