UPDATE: EV-MB Buildings: Elevators service interruption - March 06, 2026 (08:00 - 16:00)

March 3, 2026
|
By Catherine Goniotakis


To the users and occupants of the EV and MB buildings,

A planned interruption of the Elevator Banks serving the EV and MB buildings is SCHEDULED for Friday, 2026-03-06, between the hours of 08:00 and 16:00. This interruption is required to allow for the installation of barricades in the elevator hoistway pits in accordance with the new RBQ Code compliance requirements.  

Follow up work required:

North Bank 1 (ENCS tower) – ELEV1-3 (2 barricades)

South Bank 2 (ENCS tower) – ELEV4-6 (2 barricades) –bank with freight

South East Bank 3 (Fine Arts tower) – ELEV8-9 (1 barricade)

New Installations:

S-MB North Bank ELEV1-3 (2 barricades)

S-MB South Bank ELEV4-6 (2 barricades) –bank with freight

Building(s)

  • S- EV / Engr, Comp. Sci. & Visual Arts Complex
  • S- MB / John Molson School of Business

General Information

●        Individual elevators will be stopped temporarily for installation of safety barricades.

●        For access in the EV building from levels S1, S2 and S3, while the (ENCS tower – bank with freight) is out of service, please use the South East Bank 3 (Fine Arts tower) freight; the call button is on the frame of the unit.

●        Elevators in the MB building will be programmed to access all floors during installation. Two elevators are temporarily out of service per barricade install.