LB Building: 19-133 - Shut down to MCC-SS2 - August 28 - 29, 2025 (22:00 - 07:00)
To the users and occupants of the LB building,
A necessary shut down to MCC-SS2 is SCHEDULED to begin on Thursday, 2025-08-28 at 22:00 and should be completed on Friday 2025-08-29 at 07:00. This shut down is required as part of project #19-133 (LB Replace Main Entrance Doors).
Building
- LB / J.W. McConnell Building
General Information
MCC-SS2 panel controls the following :
- 72-v31 chauffage des vestibule (bishop ruel)
- 73-v31 chauffage des vestibule (ruelle Mackay)
- A2-P03 pompe d'eau de chauffage moyenne température local A055.00
- A2-P04 pompe d'eau de chauffage moyenne température local A055.00
- 76-v31 chauffage des vestibule (bishop restaurant)
Given the time of year, there should be no impact to building as the heating systems are not presently in use.
We thank your for your understanding.