CJ Building: Interruption of emergency power - August 14, 2025 (07:00 - 08:00)
To the users and occupants of the CJ building,
A planned interruption of the emergency power is SCHEDULED for Thursday, 2025-08-14, between the hours of 07:00 and 08:00. Corrective & Preventative maintenance is required to regularly inspect and maintain the generator and Automated Transfer Switch (ATS) to ensure optimal performance and reliability .
Building
● L- CJ / Comms. & Journalism Building.
General Information
● During these interruptions, emergency lighting and any equipment connected to emergency outlets that are not supported by an Uninterruptible Power Supply (UPS) will be affected.
● Normal electrical power will not be affected by this maintenance.
● Generator maintenance will cause two 10-second emergency power interruptions.
● CTA maintenance will cause a 120-minute or 2 times 5 minutes emergency power shutdown depending on if a bypass is available or not.
● CTA Visual inspection will cause no interruptions.
● Automated Transfer Switch work will start at the scheduled time listed above.
● The generator inspection will happen either before or after the 120-minute Automated Transfer Switch shutdown.
● Depending on the technician and timing, the 10-minute generator shutdown may happen before or after the 120-minute Automated Transfer Switch inspection.
We thank you for your understanding.