UPDATE: AD/CC/DO/FC/GE/HA/HB/HC/HU/PC/PS/PY/RA/RF/SP Buildings: Interruption of emergency power - December 2024

December 12, 2024
|
By Catherine Goniotakis


To the users and occupants of the Loyola buildings,

A planned interruption of the emergency power is SCHEDULED for December 2024 according to the revised table provided below.  Preventative maintenance is required to regularly inspect and maintain the generator and Automated Transfer Switch (ATS) to ensure optimal performance and reliability.

Buildings

●       L- AD / Administration Building

●       L- CC/ Central Building

●       L- DO/ Stinger Dome

●       L- FC / FC Smith Building

●       L- GE / Genmoics Building

●       L-HA / Hingston wing A

●       L-HB / Hingston wing B

●       L-HC / Hingston wing C

●       L-HU / Applied Science Hub

●       L- PC / Perform Center

●       L- PS / Physical Services Building

●       L- PY / Psychology Building

●       L- RA / Rec & Athletics Building

●       L- RF / Conference center

●       L- SP / Science Complex

 

General Information

 

Semi-Annual Generator Inspection

DATE

TIME

CODE

BUILDING

EQUIPMENT

CAPACITY

DURATION OF INTERUPTION

CONTACT (CONCORDIA)

AFFECTED BUILDING(S)

Wednesday, December 11 2024

09:30 - 10:30

PS

Physical Services Building

Generator

125KW

5 seconds
(2 times)

Christopher Wilson

PS

Wednesday, December 11 2024

11:30 - 12:30

PC

Perform Center

Generator

800KW

5 seconds
(2 times)

Christopher Wilson

DO + PC + RA

Tuesday, December 17 2024

08:30 - 09:30

RF/HU

Applied Science Hub and Loyola Jesuit Hall and Conference Center

Generator

1250KW

5 seconds
(2 times)

Christopher Wilson

AD + CC + FC + HA/B/C + HU + PY + RF

Wednesday, December 18 2024

07:30 - 09:00

SP

Richard J. Renaud Science Complex

Generator

1500KW

5 seconds
(2 times)

Christopher Wilson

SP + GE

 

 

 

 

 

 

 

 

 

Note: During semi-annual maintenance, a generator load test will be conducted for one hour. Minimal impact is expected, with minor power fluctuations during load transfer. Certain equipment may require resetting.

 

ATS Inspection

DATE

TIME

CODE

BUILDING

EQUIPMENT

CAPACITY

DURATION OF INTERUPTION

CONTACT (CONCORDIA)

AFFECTED BUILDING(S)

Wednesday, December 11 2024

09:00 - 09:30

PS

Physical Services Building

ATS

 

0 mins (Inspection)

Christopher Wilson

PS

Wednesday, December 11 2024

11:00 - 11:30

PC

Perform Center

ATS

 

0 mins  (Inspection)

Christopher Wilson

DO + PC + RA

Tuesday, December 17 2024

07:30 - 08:00

RF225

Loyola Jesuit and Conference Center

ATS

225A

0 mins  (Inspection)

Christopher Wilson

RF (Génerator Shelter)

Tuesday, December 17 2024

06:00 - 07:30

HU-100A

Applied Science Hub

ATS

1200A

90 mins (Maintenance)

Christopher Wilson

HU

Tuesday, December 17 2024

07:00 - 07:30

HU-225A

Applied Science Hub

ATS

225A

0 mins  (Inspection)

Christopher Wilson

HU

Tuesday, December 17 2024

08:00 - 08:30

RF600

Loyola Jesuit and Conference Center

ATS

600A

0 mins  (Inspection)

Christopher Wilson

AD + CC + FC + HA/B/C + PY + RF

Wednesday, December 18 2024

06:00 - 07:30

SP

Richard J. Renaud Science Complex

ATS

 

90 mins (Maintenance)

Christopher Wilson

SP + GE

 

 

 

 

 

 

 

 

 

Note: During ATS maintenance, both power sources will be shut down to allow for safe inspection and servicing, including cleaning and lubrication. Consequently, emergency lighting and equipment connected to emergency outlets without UPS will be affected.

●       During these interruptions, emergency lighting and any equipment connected to emergency outlets that are not supported by an Uninterruptible Power Supply (UPS) will be affected.

●       Normal electrical power will not be affected by this maintenance.

●       Generator maintenance will cause two 5-second emergency power interruptions.

●       ATS maintenance will cause a 90-minute emergency power shutdown.

●       ATS Visual inspection will cause no interruptions.

●       Automated Transfer Switch work will start at the scheduled time listed above.

●       The generator inspection will happen either before or after the 90-minute Automated Transfer Switch shutdown.

●       Depending on the technician and timing, the 5-minute generator shutdown may happen before or after the 90-minute Automated Transfer Switch inspection.

We thank you for your understanding.

Property Management
Facilities Managment