A planned closure of the laneway directly north of the Hall building and certain parking spots in the Hall building back side parking lot has been RESCHEDULED.
The closure will take place between Thursday, 2023-06-29 at 7:00 and Friday, 2023-06-30 at 17:00, with noisy work starting only at noon on Thursday.
This closure is required as part of the Hall Stair Project.
Buildings
● S- Hall / Henry F. Hall Building
● S- Annexes
General Information
● The laneway directly north of the Hall building as well as the area corresponding to some parking spots will be closed to vehicle and pedestrian
traffic (the blue contour in image below is the zone of work).
○ Parking spots rendered inaccessible because of the closure of this zone of work will be temporarily relocated.
● Public protection will be assured during the entire period; barricade tape will be installed to delimit the work site.
● Some level of noise, starting only at noon on Thursday June 29, is to be expected intermittently due to drilling. ● Access to the rest of the parking lot will be possible from the laneway north of Annexes CI and MU. ● The closure is weather dependent and could be extended if necessary. ● Access to the Mackay sidewalk and the Hall terrace via the Mackay staircase will be maintained.
We thank you for your understanding.