A planned closure of the laneway directly north of the Hall building and of some parking spots in the Hall building back side parking lot is SCHEDULED to take place between Wednesday, 2023-06-28, at 07:00 and Thursday, 2023-06-29, at 17:00.
This closure is required as part of the Hall Stair Project.
Buildings
● S- Hall / Henry F. Hall Building
● S- Annexes
General Information
● The laneway directly north of the Hall building as well as the area corresponding to some parking spots will be closed to vehicle and pedestrian traffic.
○ Parking spots rendered inaccessible because of the closure of this zone of work will be temporarily relocated.
● Public protection will be assured during the entire period; barricade tape will be installed to delimit the work site.
● Some level of noise is to be expected punctually throughout the two days due to drilling.
● Access to the parking lot will be possible from the laneway north of Annexes CI and MU.
● The closure is weather dependent and could be extended if necessary.
● Access to the Mackay sidewalk and the Hall terrace via the Mackay staircase will be maintained.
We thank you for your understanding.