Skip to main content
notice

POSTPONED: RF Building: Chimney masonry repair work - July 14 and 15, 2022

July 14, 2022
|
By Ryan McCrory


To the users and occupants of the RF building,

The planned repair of the RF building chimney SCHEDULED to take place today and tomorrow has been postponed. We will send a revised date once we have this information.

This work is required to secure spalling masonry on the upper portion of the chimney.  

Building

  • L- RF/ Refectory Building

General Information

  • The width of Terrebonne street will be fully occupied by a safety perimeter, delimited by orange cones and danger tape.
  • The road will be temporarily blocked throughout the work and there will be a detour for access.
  • Pedestrians will be re-directed around the safety perimeter and the mechanical room access will be controlled, if required.
  • The work involves the installation of a safety netting in various locations around the chimney.
  • A flag person will be on site to assist pedestrians and facilitate local circulation.
  • There will be some noise due to some drilling into the exterior wall and the use of a generator.

Property Management

Facilities Management




Back to top

© Concordia University