Hall Building: Façade inspection - November 15 to 17, 2021
To the users and occupants of the Hall Building,
A planned inspection of the building façade is SCHEDULED to take place from Monday, 2021-11-15, until Wednesday, 2021-11-17, between the hours of 07:00 and 17:00 each day, weather permitting.
Building
• S- Hall / Henry F. Hall Building
General Information
• Daily activities of the building will not be disturbed.
• The area of the swing stage that will overhang the sidewalk area will be cordoned off using T-RV-10 cones and caution tape to prevent pedestrians from walking beneath the platform.
• The contractor will set-up safety perimeters while swing stages are being relocated at ground level.
• Access to the building will be maintained, however, some entry points may be temporarily (approx. 2hrs) diverted to prevent occupants from entering the work areas.
• The East entry will be blocked off for a period of approx. 2hrs on Monday, November 15th, but will remain accessible as an emergency exit.
• A flag person will be on site to assist pedestrians in locations where the lift is in conflict with the entry points.
We thank you for your understanding.
Property Management
Facilities Management