Mackay Street Annexes: Façade inspections from November 9 to 12, 2021

November 8, 2021
|
By Khoba Sysavane



To the users and occupants of the Mackay Street Annexes,

A series of planned visual inspections of the Mackay Street Annexes is SCHEDULED to take place from Tuesday, 2021-11-09, to Friday, 2021-11-12 between the hours of 07:00 and 17:00. 
 

Buildings
 

  • Q Annex
  • P Annex
  • T Annex
  • RR Annex
  • R Annex
  • FA Annex
  • EN Annex
  • X Annex
  • Z  Annex
  • PR Annex
  • V Annex
  • MK Annex


General Information
 

  • A lift will be used to conduct the inspections.
  • Daily activities of the building will not be disturbed.
  • At any given time, the lift will only occupy a 12’x 15’ portion of the side walk.
  • Occupants should avoid using rear access doors.
  • Noise and dust will be minimal and in very short periods.
  • A flagman will be onsite to assist pedestrians if the lift is in conflict with the entry points of the respective buildings.

 

Daily Activities
 

Tuesday, Nov 9th : at façade X1 (front façades)

  • OE-1 & 2.
  • Noise and dust will be minimal and in very short periods.
  • Flagman will be provided to control pedestrian traffic beneath the work area.


Wednesday, Nov 10th :  at façade PR2 (rear)

  • OE-3 & OE-5 & OE-6.
  • Requires parking area (nos. 23 to 31) from 7 AM to 4PM.
  • Noise and dust will be minimal and in very short periods.
  • Lift apparatus will be parked at the back of the buildings, overnight.
  • Occupants should avoid using rear access doors.


Thursday Nov 11th :  at façade R2 (rear)

  • OE-4.
  • Requires parking area (nos. 12 to 14) from 7 AM to noon.
  • Noise and dust will be minimal and in very short periods.
  • Lift apparatus will be parked at the back of the buildings, overnight for pick-up.
  • Occupants should avoid using rear access doors.

 

We thank you for your understanding.

 