To the users and occupants of the GN building,
A planned visual inspection of the Grey Nuns Building is SCHEDULED to take place from Tuesday, 2021-10-05, until Thursday, 2021-10-15, between the hours of 09:00 and 17:00 each day, weather permitting.
Building
- S- GN / Grey Nuns Building
General Information
- Daily activities of the building will not be disturbed.
- On Tuesday, October 5th, parking along façade A2 must be vacant. Refer to drawing below.
- On October 5th and October 6th, the area around the Z(P) wing must be vacant. Refer to drawing below.
- On Wednesday, October 6th, parking along façade F3 must be vacant. Refer to drawing below.
- Access to all buildings will be maintained, however some entry points may temporarily (30 minutes to 1 hour) be diverted with cones and caution tape to prevent occupants from entering the work areas.
- A flagsperson will be onsite to assist pedestrians if the lift is in conflict with the entry points of the respective buildings.