Skip to main content
notice

HU Building: Interruption of regular power - October 5, 2021

October 1, 2021
|
By Catherine Goniotakis


To the users and occupants of the HU Building,

A planned interruption of the regular electrical power is SCHEDULED for Tuesday morning, 2021-10-05, between the hours of 05:00 and 07:00. This interruption is required to ensure that all emergency power systems are operating flawlessly in the event of an electrical power interruption.

Building:  

  • L- HU / Applied Science Hub

General Information:       

  • This interruption will affect the entire building.
  • The following systems will be impacted during the interruption, as described:
    • Electricity/telecom:
      • Emergency outlets (red): momentary interruption at start of shutdown (a few seconds)
      • Regular outlets (white) : off
      • Emergency lighting:  momentary interruption at start of shutdown (a few seconds)
      • Normal lighting on floors 1 to 4: off
      • Lighting in SS2 Aquatic Lab: momentary interruption at start of shutdown (a few seconds)
      • Data outlets not dedicated to telephones: momentary interruption at start of shutdown (a few seconds)
    • Ventilation and air-conditioning:
      • Floors 1 to 4: off
      • Floor 3 cold room: off
      • Fume hoods, fume extraction arms, canopy hoods, cabinets: minimum extraction
    • Plumbing:
      • Chilled water (for equipment): off
      • Chilled water (for bioprocessing): off
      • Compressed air: off
    • Equipment:
      • Autoclaves: off
      • Ice machines: off
      • Millipore water purifier: off
      • Electric vehicle charging stations: off
      • Passenger elevators: off (will remain on 1st floor during the interruption)
  • The following systems will NOT be impacted during the interruption:
    • SS2 ventilation and air-conditioning: Aquatic Lab, Bioprocessing Lab, cold and freezer rooms
    • SS2 cooling systems for aquarium water (GLF, AQF)
    • Domestic water (hot and cold)
    • Lab water (hot and cold)
    • Deionized water
    • Emergency water (sprinklers, eye-wash, emergency showers)
    • Natural gas
    • Gas cabinets
    • Freight elevator
    • Access controls (card readers)
    • Communications (telephones, Wi-Fi, building entrance intercoms)
  • IITS has performed updates on all computers to automatically restart after a power outage, therefore there is no need to notify IITS to restart computers.
  • In the unlikely event that your computer does not restart automatically, please open a ticket with IITS.
We thank you for your understanding.
 
Property Management
Facilities Management



Back to top

© Concordia University