A planned repair of the exterior of the FB building is SCHEDULED to take place from Monday, 2021-05-17, until Friday, 2021-05-21, between the hours of 07:00 and 17:00 each day. This work is required as result of the FB façade inspection project.  

Buildings

  • S- FB / Faubourg Building

General Information

  • A swing stage will be installed to carry out the work.
  • The work includes tactile inspections and exploratory openings of the building façades.
  • The inspection is weather dependent. No inspection will take place if there is rain or high winds.
  • Daily activities of the building will not be disturbed.
  • The users of the building will be given access at all times.
  • There may be some noisy work resulting from the exploratory openings in the façade.