Skip to main content
notice

LB Building: Crane installation on de Maisonneuve Street - April 26, 2021

April 23, 2021
|
By Catherine Goniotakis


To the users and occupants of the LB Building,

A crane will be installed on de Maisonneuve Street on Monday, 2021-04-26, in order to repair a broken window on the front façade of the LB building.

Buildings

●        S- LB / J.W. McConnell Building

General Information

●        The contractor, Vitrerie A&A, will oversee the crane installation and window replacement.

●        A portion of de Maisonneuve Street may be blocked off, but vehicles should still be able to circulate.

●        Barricade tape will be installed to delimit the work site and workers will direct pedestrian circulation.

●        The contractor will provide public protection during the entire period of the installation, work and removal of the crane.

●        The building will remain open, however part of the staircase that leads to level 1 will be blocked off for safety reasons.

We thank you for your understanding.

 

Property Management
Facilities Management

 




Back to top

© Concordia University