Please be advised that a planned interruption of the domestic water is SCHEDULED for Saturday, 2021-02-06, between the hours of 06:00 and 15:00. This interruption is required as part of the H6 Renovation Project.
Buildings
● S- Hall / Henry F. Hall Building
General Information
● Hot & cold water will be out of service from floors 4 to 14.
● Washrooms and eye-wash stations will be out of service from floors 4 to 14.
● Occupants must use the washrooms on the ground floor or on the 3rd floor during the interruption.
● The server room on the 9th floor will be affected, but arrangements will be made to ensure the room temperature is adequate.