Hall 6th floor: Construction enclosure - Tuesday, April 2nd to Friday April 12th, 2019
To the users and occupants of the Hall building,
Please be advised that the installation of a temporary construction enclosure is planned on the 6th floor of the Hall building beginning Tuesday, April 2nd, 2019 at 7:00 and will remain in place until 15:00 on April 12th. The enclosure will be located in the main corridor area (north of the escalators) and is required to do work in the ceiling.
● A tunnel will allow access to the suite with Aboriginal Student Resource Centre, Sexual Assault Resource Centre and The Link.
● Access to the H535 auditorium will be from the 5th floor entrance only. The 6th floor door will be closed.
● Access to the H632 and H634 Writing Assistance rooms will be from the west side of the building, requiring a detour around the central block of rooms.
● There will be no access to the freight elevators from the 6th floor.
● Directional signage will be posted to aid in wayfinding.
We thank you for your understanding.
Project Management
Facilities Management