Please be advised that a crane will be installed in front of the Vanier Library building’s main entrance on Monday morning, 2019-02-25, between the hours of 04:00 and 09:00. This installation is required to place and install a cooling tower on the roof of the VL building.
Buildings
● L- VL / Vanier Library
● L- VE / Vanier Extension
● L- PT / Oscar Peterson Concert Hall
General Information
● The VL, VE and PT buildings will be accessible through the Students Center (SC) building’s main entrance.
● Signage will be posted to instruct users how to get to the above-mentioned buildings.
● A security agent will patrol the area to offer assistance.
● Barricade tape will be installed to delimit the work site.
● There may be minimal noise and disturbances.
We thank you for your understanding.