Please be advised that a crane will be installed on Bishop Street this Wednesday, 2018-08-22, between the hours of 07:00 and 18:00. This is required to deliver seven new skylights to the roof as part of the LB7 skylight replacement project.
Buildings
● S- LB / Webster Library Building
General Information
● The street will be open to vehicles. A traffic guard will be present to direct circulation.
● Bishop street will be closed off to pedestrian circulation during the entire work period.
● Signage and red barricade tape will be installed to delimit the work site.
● The contractor will provide public protection during the entire period of the installation, work and removal of the crane.
● If the weather does not permit the installation of the crane on Wednesday, the work will be moved to a later date.
● There may be minimal noise and disturbances.
We thank you for your understanding.