Skip to main content
notice

Access to the MB Building through the tunnel

August 17, 2022
|
By Facilities Management


Facilities Management is undertaking major work on the the main entrance to the John Molson Building (MB). Until it is complete, community members should access MB through the tunnel from the Engineering, Computer Science and Visual Arts Integrated Complex (EV).

Though it is possible to enter MB through the southern door, taking the tunnel will reduce pedestrian activity near the worksite and increase security for all.

Getting to the EV-MB tunnel

  • From the metro at Guy St. and De Maisonneuve Blvd.: turn right at the turnstiles, rather than going left to street level. The tunnel is just past the EV doors.
  • From upper levels in EV: take the escalators or stairs down to the metro level and find the tunnel at the landing, on your left.
  • From Hall Building (H) and the Library Building (LB): take the tunnel towards the metro station and continue past the turnstiles into EV.

Need help or more information?

For more information on the work, please read this article.

If you are a community member in need of immediate assistance, please call Campus Security at 514-848-3717.

For longer-term needs related to MB access, please email Facilities Management.

Thank you in advance for your collaboration and understanding.




Back to top

© Concordia University